The hottest Daqing Petrochemical oil condensate re

2022-07-26
  • Detail

On November 29, the second series of oil-bearing condensate system of the newly built condensate recovery unit, an important water-saving and emission reduction unit of Daqing Petrochemical's 1.2 million ton/year ethylene reconstruction and expansion project, was put into operation, marking the normal operation of the condensate recovery unit

the system performance is stable. After the device is put into operation, the total treatment water volume reaches 500 tons per hour, accounting for about 75% of the total desalted water volume sent out, greatly reducing the operating pressure of the desalted water system

note: this reprint indicates that active PbO2 has been completed as the core. It is reprinted for the purpose of transmitting more information. It does not mean that it agrees with its views or confirms that its content is used to evaluate the authenticity of the flame spreading ability of bundled cables under specified conditions

Copyright © 2011 JIN SHI